# Gradnja podatkovnih centrov- Project Manager gradnje Junior do Mid (planer/ka)

- **Company:** MGAC
- **Location:** Fort Wayne, IN; Buffalo, WV; Columbus, OH
- **Način dela:** Način dela ni naveden
- **Salary:** USD 100–145K / leto
- **Raven izkušenj:** Junior
- **Področje:** Operativa in administracija
- **Države:** Združene države Amerike
- **Posted:** 2026-10-22
- **Ključna dejstva:** Izkušnje: 2+ let
- **Job page:** https://sl.rolefalcon.com/job/17706509-data-center-construction-junior-to-mid-construction-project-manager-scheduler

Data Center Construction- Junior to Mid Construction Project Manager (Scheduler) je odprto delovno mesto pri MGAC, podjetje iz panoge Svetovanje, agencije in poslovne storitve. Oglas kot lokacijo navaja Buffalo, Združene države Amerike. Uvrščamo ga na področje Operativa in administracija. Pričakujejo 2+ let delovnih izkušenj. MGAC ima na tej spletni strani odprta delovna mesta: 6.

To apply, open the job page above and follow its Apply link to the original posting.

## Podobne zaposlitve

- [Izvršni/a asistent/ka Senior](https://sl.rolefalcon.com/job/40152943-senior-executive-assistant-coupang-seattle) — Coupang
- [Administrativni asistent/ka Senior](https://sl.rolefalcon.com/job/37245889-senior-administrative-assistant-1password-remote-united-states-canada) — 1Password
- [Pomočnik/ica generalnega direktorja](https://sl.rolefalcon.com/job/30264697-assistant-general-manager-sud-stop-car-wash) — Sud Stop Car Wash
- [Administrativni asistent/ka](https://sl.rolefalcon.com/job/25091124-administrative-assistant-block-llp-burbank) — Block LLP
- [Izvršni asistent/ka](https://sl.rolefalcon.com/job/24951647-executive-assistant-coder-united-states) — Coder
- [Koordinator/ica pisarne](https://sl.rolefalcon.com/job/24578607-office-coordinator-rexford-industrial-costa-mesa) — Rexford Industrial
- [Koordinator/ica recepcije](https://sl.rolefalcon.com/job/24225915-front-desk-coordinator-dental365-henrico) — Dental365
- [Skladiščnik/ca II, zemeljske operacije](https://sl.rolefalcon.com/job/24102776-warehouse-associate-ii-ground-operations-veho-tech-inc-plainfield) — veho-tech-inc
